RFQS F-01 — Scope Starter Checklist

Free download · v1.0

A one-page checklist to surface scope gaps, exclusions, and assumptions before signing or awarding or accepting a contractor bid.

The RFQS Scope Starter Checklist gives clients, consultants, and contractor support teams a fast structured way to pressure-test the scope of work before commitment. It is built around the everyday gaps that inform change orders, change-order documentation, and contract reviews — items missing from the bid, vague specs, undefined interfaces, and unstated assumptions.

Use it at the front of any contractor bid review, scope of work review, or pre-award checkpoint. Walk through the checklist line-by-line against the contractor’s bid package, mark gaps, and capture the questions you need answered before the contractor is awarded. It is meant to be printed, marked up, and circulated — a working document, not a deliverable.

Fit: residential, fit-out, light commercial, and small civil projects. Best paired with the RFQS Sample Cost Estimate Template (F-02) when reviewing pricing alongside scope.

What’s included

  • Single-page PDF checklist (printable, US Letter)
  • Categorised scope-gap checklist items: structure, envelope, MEP, finishes, externals, interfaces
  • Margin column for action / owner / due date
  • How-to-use note on the back of the sheet

Specifications

Versionv1.0
FormatPDF (US Letter, single page)
DeliveryEmailed to your inbox in seconds
LicenseInternal commercial use; do not redistribute

Enter your details on the next page and we’ll email the download link to your inbox right away. No spam — see our Privacy Policy.

Decision-support tool — not professional advice. See full Disclaimer. Issues with the free download? Email support@rfqslb.store.

Built by RFQS — Quantity Surveying Support Services


Need this work done for you? RFQS offers an independent, document-based commercial review service for MENA construction project teams. See Scope Gap & Exclusions Review on rfqslb.com.